GTT received an order from the South Korean shipyard Daewoo Shipbuilding and Marine Engineering (DSME) for the tank design of an LNG carrier (LNGC) offering a capacity of 173,400 m3.  

GTT receives a new order from DSME for the tank design of an LNG carrier

This unit will be built on behalf of a European ship-owner.

The tanks will be fitted with the NO96 GW technology and the vessel’s delivery is expected by first half of 2021.

Source: GTT