Sibu, Malaysia (MYSBW)

Tempo no porto:Mar 22, 03:02

Posição no mapa
Navios esperados: 2
Navios no porto: 3
 

Expected ships in Sibu

ETA Embarcação Dist./Tempo restante Último porto Construção GT DWT Tamanho (m)
Mar 24, 16:00 Available to Satellite users Available to Satellite users 2004 1687 2461 78 x 16
Mar 26, 16:10 Available to Satellite users Available to Satellite users 2006 2948 4340 86 x 16

Results are limited to 10. Additional results are available with a subscription.

Recent ship arrivals in Sibu

Chegada (LT) Embarcação Último porto Construção GT DWT Tamanho (m)
Currently, there are no recent arrivals

Results are limited to 10. Additional results are available with a subscription.

Recent ship departures from Sibu

Partida (LT) Embarcação Destino Construção GT DWT Tamanho (m)
Currently, there are no recent departures

Results are limited to 10. Additional results are available with a subscription.

Navios no porto

Último relatório Embarcação Construção GT DWT Tamanho (m)
Mar 21, 12:42 2014 2882 4242 90 x 15
Mar 21, 15:33 2015 2242 2800 84 x 15
Mar 21, 18:04 1993 2223 2954 85 x 14

Results are limited to 10. Additional results are available with a subscription.