Abu Zenimah, Egypt (EGAZA)

Orario del porto:Jan 15, 18:31

Posizione della carta
Navi previste: 0
Navi in porto: 1
 

Expected ships in Abu Zenimah

ETA Nave Distanza/Tempo Ultimo porto Costruito GT DWT Dimensione (m)
Currently, there are no expected ships

Results are limited to 10. Additional results are available with a subscription.

Recent ship arrivals in Abu Zenimah

Arrivo (LT) Nave Ultimo porto Costruito GT DWT Dimensione (m)
Currently, there are no recent arrivals

Results are limited to 10. Additional results are available with a subscription.

Recent ship departures from Abu Zenimah

Partenza (LT) Nave Destinazione Costruito GT DWT Dimensione (m)
Currently, there are no recent departures

Results are limited to 10. Additional results are available with a subscription.

Navi in porto

Ultima segnalazione Nave Costruito GT DWT Dimensione (m)
Jan 15, 16:05 1979 3543 - 56 x 55

Results are limited to 10. Additional results are available with a subscription.