The Fairplayer and her team have successfully completed the pre-installation and tensioning of a shallow water CALM buoy mooring system at a depth of 26 metres for the Mersa El-Hamra terminal offshore Egypt.

Jumbo successfully installs another mooring system in Egypt
Caption: Heavy Load Carrier Fairplayer - Image courtesy of Ya Ray Yang

Scope of Work

Jumbo’s scope included the pre-lay of 10 Stevshark drag anchors and 6 chain moorings and the subsequent tensioning of the mooring legs up to 512 tonnes, for our client WEPCO / Micoperi.

Planning & Preparation

With a short lead time, the project team managed to professionally prepare for the full scope of work and provide the required project procedures, equipment and personnel on-time.

“Jumbo would like to thank the specialised teams who contributed towards making this project possible. We look forward to our next offshore mooring installation!”

Source: Jumbo