DEME’s dual fuel cable installation vessel ‘Living Stone’ has been bunkered for the first time with LNG.
Directly after the maiden LNG bunkering operation, ‘Living Stone’ then went on to successfully complete her LNG sea trials.
The ship-to-ship bunkering was conducted in Vlissingen by Titan LNG’s FlexFueler.
In line with DEME ambition to achieve climate-neutral operations by 2050, the Company is heavily investing in the integration of climate proof technology and energy saving features in DEME vessels and equipment
Source: DEME