Panama Canal has posted the latest Expansion Program Update.
As indicated on the official website of the Panama Canal Expansion, the overall progress of the project is 86% with still not finished:
- Pacific Access Channel: ready at 86%;
- Gatun Lake and Culebra Cut Dredging: ready at 93%;
- Design and Construction of the Third Set of Locks: ready at 83%;
- Raising Gatun Lake's Maximum Operating Level: ready at 95%.